Task 1: Setting up of the testing equipment including a diesel pumping, flow and pressure measuring devices and drainage pipework.
Task 2:- Water sample from the test will be taken and sent away for the testing and the pH of the water will also be measured on site.
The sample will be submitted to the CSIR for a fully accredited laboratory chemical analysis.
Task 3:- The pumping test data will be analysed (water flow and discharge pressure), the a 72 hour period.
Task 4:- The results will then be comprehensively be documented.
The water samples are to be analysed for the following parametres only.